A public–private integrated textile park · 7 km from Sri City

Tarakeswara Textile Park

Solar Power

Power is the largest running cost a spinning unit carries, so the park generates part of its own.

A 2.5 MW solar plant is planned for captive consumption within the park. Together with the internal transmission and distribution network, it insulates member units from grid variability and keeps running costs predictable.

2.5 MW captive capacity

Solar Power

Capacity & plan

What is planned for solar power

  • A 2.5 MW solar plant for captive purposes within the park
  • Helps the park become self-sufficient in its operations
  • Works alongside the park’s own substation and distribution network
  • Supplies internal distribution and street lighting across the campus

Also in the park

The rest of the value chain

Looking for space in an integrated park?

Plots, built factory sheds and common infrastructure are available to member units. Tell us what you need and we will walk you through the plan.